§ 801-57. Removal or replacement of noncomplying work.  


Latest version.
  • All work which has been disapproved or is not acceptable to the Board shall be removed and replaced or otherwise corrected to the point of complying with the requirements of the Board for acceptance. Any work which has been covered by subsequent work prior to acceptance or is otherwise not available or obscured to the point of rendering inspection of the work difficult shall be considered to be not acceptable to the Board. Such subsequent work shall be removed as directed by the Board's engineer to insure availability of the work to be inspected as required herein. The release of the performance guarantee shall depend upon the acceptance of all work prescribed herein and on the definitive plan and as directed by the Board.