§ 801-39. Clearing, grubbing and excavation.  


Latest version.
  • A. 
    The entire area to be occupied by the roadway plus an additional four feet or extending outward to the toe of slopes in fill areas, whichever is greater, shall be excavated a minimum of 15 inches below finished grade in cut sections or as necessary to remove the topsoil in fill sections or such greater depth as may be required by the Board's engineer if soft or yielding material, clay, peat, silt, sand pockets, boulders or rocks, organic materials, or other material detrimental to the subgrade is encountered. All fill or undisturbed material shall be non-frost-susceptible and shall contain not more than 3% passing the No. 200 sieve for a minimum depth of three feet below the finished roadway grade.
    B. 
    Trees intended to be preserved shall be protected from injury by suitable boxes or fenders, or wells if in fill.
    C. 
    The Board's engineer will make an inspection when this phase of the work is completed.