§ 240-44.2. Ground-Mounted Solar Photovoltaic Overlay District.
Latest version.
-
A.Purpose.(1)This section promotes the creation of new large-scale, ground-mounted solar photovoltaic installations by providing standards for the placement, design, construction, operation, monitoring, modification and removal of such installations that address public safety, minimize impacts on scenic, natural and historic resources and for providing adequate financial assurance for the eventual decommissioning of such installations. This section ordinance is adopted pursuant to the Commonwealth of Massachusetts Green Communities Act.(2)The provisions set forth in this section shall apply to the construction, operation, and/or repair of large-scale, ground-mounted solar photovoltaic installations.B.Applicability. This section applies to large-scale (250 kW), ground-mounted solar photovoltaic installations proposed to be constructed after the effective date of this section. This section also pertains to physical modifications that materially alter the type, configuration, or size of these installations or related equipment.C.District established. A Ground-Mounted Solar Photovoltaic Overlay District (GMSPOD) is hereby established, and shall be considered as superimposed over any other districts established by this chapter, and is shown as an overlay on the Official Zoning Map established pursuant to § 240-6, Zoning MapD.Definitions. These definitions shall apply to § 240-44.2 exclusively:
- AS-OF-RIGHT SITING
- The ground-mounted solar photovoltaic installation may proceed without the need for a special permit, variance, amendment, waiver, or other local discretionary approval. As-of-right development is subject to Article IX, Site Plan Review. As-of-right solar photovoltaic installations that are consistent with the Zoning Ordinance and applicable state and federal law can be reasonably regulated and approved by the Building Commissioner.
- GROUND-MOUNTED SOLAR PHOTOVOLTAIC INSTALLATION
- A large-scale solar photovoltaic (PV) system that is structurally mounted on the ground, not roof-mounted, and has a nameplate capacity of at least 250 kW DC.
- OFF-GRID SYSTEM
- A solar photovoltaic installation where all energy generated on the installation site is consumed on that site and does not send any energy into the electrical grid for distribution.
- RATED NAMEPLATE CAPACITY
- The maximum rated output of electric power production of the photovoltaic system in direct current (DC).
E.Application and review.(1)Ground-mounted, large-scale solar photovoltaic installations with 250 kW or larger of rated nameplate capacity shall undergo site plan review pursuant to Article IX, Site Plan Review, prior to construction, installation or modification as provided in this section. All plans and maps shall be prepared, stamped and signed by a professional engineer licensed to practice in Massachusetts.(2)Required documents. In addition to the requirements of § 240-102, Contents of site plan, the project proponent shall provide the following documents:(a)A site plan showing:[1]Property lines and physical features, including roads, for the project site;[2]Proposed changes to the landscape of the site, grading, vegetation clearing and planting, exterior lighting, screening vegetation or structures. The square footage of each disturbed area shall be identified on a plan, and details of any site alteration, including number and species of trees to be removed, shall be provided.[Amended 8-17-2017 by Order No. 2018-04][3]Blueprints or drawings of the solar photovoltaic installation signed by a professional engineer licensed to practice in the Commonwealth of Massachusetts showing the proposed layout of the system and any potential shading from nearby structures;[4]One- or three-line electrical diagram detailing the solar photovoltaic installation, associated components, and electrical interconnection methods, with all National Electrical Code compliant disconnects and overcurrent devices;[5]Documentation of the major system components to be used, including the PV panels, mounting system, and inverter;[6]Name, address, and contact information for proposed system installer;[7]Name, address, phone number and signature of the project proponent, as well as all co-proponents or property owners, if any;[8]The name, contact information and signature of any agents representing the project proponent; and(b)Documentation of actual or prospective access and control of the project site (See also Subsection G below.);(c)An operation and maintenance plan (See also Subsection H below.);(d)Zoning district designation for the parcel(s) of land comprising the project site (submission of a copy of a Zoning Map with the parcel(s) identified is suitable for this purpose);(e)Description of financial surety that satisfies Subsection N(3) below.F.Site control. The project proponent shall submit documentation of actual or prospective access and control of the project site sufficient to allow for construction and operation of the proposed solar photovoltaic installation.G.Operation and maintenance plan. The project proponent shall submit a plan for the operation and maintenance of the ground-mounted solar photovoltaic installation, which shall include specific measures for maintaining safe access to the installation, a stormwater management plan, and general procedures for and frequency of operational maintenance of the installation.H.Utility notification. No ground-mounted solar photovoltaic installation shall receive a building permit until an executed interconnect agreement with EVERSOURCE, the utility company operating the electrical grid, has been submitted to the Building Commissioner. Off-grid systems are exempt from this requirement.[Amended 8-17-2017 by Order No. 2018-04]I.Dimensional requirements. Ground-mounted solar photovoltaic installations are subject to the front, side and rear yard setbacks as set forth in the underlying zoning district(s).J.Design standards.(1)Lighting. Lighting of solar photovoltaic installations shall be consistent with local, state and federal law. Lighting of other parts of the installation, such as accessory structures, shall be limited to that required for safety and operational purposes, and shall be reasonably shielded from abutting properties.(2)Signage. Signs on large-scale, ground-mounted solar photovoltaic installations shall comply with Article VII, Sign Regulations. A sign shall be required to identify the owner and provide a twenty-four-hour emergency contact phone number. Solar photovoltaic installations shall not be used for displaying any advertising.(3)Accessory structures. All structures accessory to ground-mounted solar photovoltaic installations shall be subject to reasonable regulations concerning the bulk and height of structures, lot area, setbacks, open space, parking and building coverage requirements. To avoid adverse visual impacts, all such accessory structures, including but not limited to, equipment shelters, storage facilities, transformers, and substations, shall be architecturally compatible with each other, multiple accessory structures shall be clustered to the greatest extent feasible and views of such structures to residential properties and roadways shall be screened with landscaping.K.Utility connections. Reasonable efforts, as determined by site plan review, shall be made to place all utility connections from the solar photovoltaic installation underground, depending on appropriate soil conditions, shape, and topography of the site and any requirements of the utility provider. Electrical transformers for utility interconnections may be above ground if required by the utility provider.L.Safety and environmental standards.(1)Emergency services. The large-scale solar photovoltaic installation owner or operator shall provide a copy of the project summary, electrical schematic, and site plan to the local Fire Chief. Upon request the owner or operator shall cooperate with local emergency services in developing an emergency response plan. All means of shutting down the solar photovoltaic installation shall be clearly marked. The owner or operator shall identify a responsible person for public inquiries throughout the life of the installation.(2)Land clearing, soil erosion and habitat impacts. Clearing of natural vegetation shall be limited to what is necessary for the construction, operation and maintenance of the large-scale, ground-mounted solar photovoltaic installation or otherwise prescribed by applicable laws, regulations, and bylaws.[Amended 8-17-2017 by Order No. 2018-04](a)Land clearing is prohibited within 800 feet from the outer boundary of any Zone I protective radius around a public water supply well or wellfield established by 310 CMR 22.(b)Land clearing in excess of two contiguous acres in connection with any single installation is prohibited.(c)No such installation shall be segmented or broken into separate ownerships so as to avoid the prohibitions of Subsection L(2)(a) and (b) above.M.Monitoring and maintenance.(1)Solar photovoltaic installation conditions. The large-scale, ground-mounted solar photovoltaic installation owner or operator shall maintain the facility in good condition. Maintenance shall include, but not be limited to, painting, structural repairs, and integrity of security measures. Site access shall be maintained to a level acceptable to site plan review. The owner or operator shall be responsible for the cost of maintaining the solar photovoltaic installation.(2)Modifications. All material modifications to a solar photovoltaic installation made after issuance of the required building permit shall require site plan review approval.N.Abandonment or decommissioning.(1)Removal requirements. Any large-scale, ground-mounted solar photovoltaic installation which has reached the end of its useful life or has been abandoned consistent with this section shall be removed. The owner or operator shall physically remove the installation no more than 150 days after the date of discontinued operations. The owner or operator shall notify the Building Commissioner by certified mail of the proposed date of discontinued operations and plans for removal. Decommissioning shall consist of:(a)Physical removal of all large-scale, ground-mounted solar photovoltaic installations, structures, equipment, security barriers and transmission lines from the site.(b)Disposal of all solid and hazardous waste in accordance with local, state, and federal waste disposal regulations.(c)Stabilization or revegetation of the site as necessary to minimize erosion. The Building Commissioner may allow the owner or operator to leave landscaping or designated below-grade foundations in order to minimize erosion and disruption to vegetation.(2)Abandonment. Absent notice of a proposed date of decommissioning or written notice of extenuating circumstances, the solar photovoltaic installation shall be considered abandoned when it fails to operate for more than one year without the written consent of the Planning Board. If the owner or operator of the large-scale, ground-mounted solar photovoltaic installation fails to remove the installation in accordance with the requirements of this section within 150 days of abandonment or the proposed date of decommissioning, the Town may enter the property and physically remove the installation.(3)Financial surety. Proponents of large-scale, ground-mounted solar photovoltaic projects shall provide a form of surety, either through escrow account, bond or otherwise, to cover the cost of removal and disposal in the event the Town must remove the installation and remediate the landscape, in an amount and in a form acceptable to the Town Attorney but in no event to exceed more than 125% of the cost of removal and compliance with the additional requirements set forth herein, as determined by the project proponent. Such surety will not be required for municipally or state-owned facilities. The project proponent shall submit a fully inclusive estimate of the costs associated with removal, prepared by a qualified engineer. The amount shall include a mechanism for pro rating removal costs as they may be affected by inflation or changes to disposal regulations.Editor's Note: Section 3 of this order reads as follows: "A building permit shall be issued by the Building Commissioner within one year from the date an application submitted is deemed complete by the Building Commissioner. Failure to issue a building permit within one year shall not result in a constructive grant."
Added 10-7-2010 by Order No. 2011-006